Saturday, December 10, 2011

The Construction Is Moving Foreward


 

Well another week has gone by with quite a bit more work done on the Jesse Lane building.  Here are some pictures of the new concrete poured on the ground floor, and some of the electrical conduit that has been added.

New Bathroom Concrete

New Conduit & Sprinklers


New Concrete For Break Room Sink
New Power Panels
More Conduit




Thank you to Daniel Wallior, Andy & Ron Musser, and Eileen, for their help today.  We got the truncated domes installed near the handicap parking stalls, and the left over dirt hauled away from the bathrooms and the excess from the new concrete approaches.  Daniel and Andy made short work of the concrete left from the saw cutting.  Ron estimated they weighed about 450 lbs each, and after he and I took a few whacks with an 8 lb sledge, just to show the youngsters the proper technique, the young muscles took over and pulverized the 7" thick block of rock, from there, it was off to the dumpster.

Meanwhile, Eileen was  maneuvering the shop vac between the studs, the wall studs that is,  to clean the dirt out of the metal wall tracks.  Next week, we will need to pull the data cables, and of course do some more cleanup. Come join in and be a part of "The Second Story".


We also want to thank Kari Gillette for providing the workers with lunch on Friday.  They were surprised and pleased.  Way to go Kari.

 





















Thanks to Daniel Wallior, Andy & Ron Musser, and Eileen for their help with placing the truncated domes, and cleanup.












3 comments:

  1. Thank you for posting this in such detail and thank your to every pair of hands. I love Missio Dei!

    ReplyDelete
  2. I am excited to go and serve my church community next weekend!!! Whose with me?!?!? Cassie

    ReplyDelete
  3. thanks for posting great details!

    ReplyDelete