Thank you to Dan & Dominic Aguilar, Tom & Ben Christopherson, two great father-son teams (fondly known as the “A-Team”), and to Myron, Diego, and Johnny, the only guy I know that just happens to carry a stud finder in his car, for pitching in and helping to install the cabinets on the lower floor of the new building. 

Special thanks to Sean Arnett for measuring, designing, and purchasing the cabinets for the new building, and to Tom, Ben, and Diego for picking up and hauling the cabinets to the building.

Things are moving fast now, the drywall has been mudded, taped and sanded, and most of the walls are primed and ready for paint. Now with the cabinets in, paint is coming next.  We need to mop all the texture over spray off the concrete downstairs on the kid’s size.  Once that’s done, it’s time to stain the concrete.  Whew, there’s still a lot of work.  So sign up and come down and join us as we prepare a place of worship for all.

I also want to thank my wife Eileen, who would have been much happier if I had stayed home with her and worked on cleaning up the yard.  Thanks Eileen for  letting me go & play with the guys.

Jim Bloom

No comments:

Post a Comment